PROJECTS
Shongweni Reservoir
- The design and construction supervision of a reinforced concrete reservoir with a capacity of 6 Mℓ.
- Reservoir inlet and outlet pipework design.
- The design and installation of subsoil drainage.
- Locating a suitable site for the proposed reservoir.
- Modelling of the Georgedale, Hammarsdale, Shongweni, Zwelibomvu to Ofudu, including the supply to Clifton Elevated Tower, bulk supply mains.
- Sizing, design and construction of a bypass past the reservoir to supply water directly from Georgedale Reservoir to Zwelibomvu Reservoir if necessary.
- The telemetry, control valves and meters on both the inlet and outlet pipelines, with their associated chambers on the existing reservoirs, were upgraded to suit the increased capacity.
Client: ‘eThekwini Municipality
Value: R 27.9 million
Key features:
- 6 Mℓ reinforced concrete reservoir together with inlet, outlet pipelines, control valves, and metering
- 2 x DN200 inlet control valve chamber for Shongweni Reservoir 2.
Awards: Highly Commended Community-Based Project – 2023 SAICE National Awards
Job created: 17 Jobs (9 Men and 8 Women)
Women employed: 8 Women
Youth employed: 12 young people were employed. In addition, a skills programme covering the following trades was offered to 20 local youth:
- Basic firefighting
- First aid
- Welding
- Scaffolding
- TLB driver
- Brick laying
- Working on heights
- Health and safety
Project output: Completed designs, drawings, specifications, procurement document and technical reports, Construction Supervision and commissioning
Year: 2019 – 2023