N2 Mhlali River Bridge


The repair and jacking of the Mhlali River Bridge (North-bound) into its original position, and to repair the bridge approaches after the April 2022 floods. Currently the north-bound traffic is diverted before the bridge repair onto the south-bound lanes and diverted back to the north-bound lanes after the bridge repair. These delays currently cause frustration amongst road users and commuters in both directions over this 3km stretch on the N2 freeway.
CLIENT: SANRAL
KEY FEATURES
- Jacking the Mhlali River Bridge (North-bound) back into its original position.
- Repairing the flood damaged bridge approaches.
- Replacing bridge bearings.
- Repair to closure walls damaged during the floods.
- Replacement of Bridge joints (rubber glands and Asphaltic plug joints)
- Improving the bridge by adding breather holes in the bridge beams, and restraint blocks to prevent reoccurrence.
- Improving and repairing the drainage and slope protection.
- Clearing the river of flood debris.